University of California Cancer Center


StonePly supplied and installed limestone panels that provided:

  • 60x the impact strength of slab stone
  • Installation 6x as fast as hand set stone
  • Lightweight recycled aluminum honeycomb backing

Architects and Owners had considered traditionally set limestone but the disruption and time delays that hand setting the cladding would have created made it impractical. They selected StonePly instead.

"StonePly offered a lightweight cladding system with numerous advantages in faster fabrication, faster install, much higher strength and far superior seismic resistance."

Project Details

Other StonePly Success Stories

Glendale Galleria Mall
Read more

Glendale Galleria Mall

Hyatt Regency
Read more

Hyatt Regency

BCBG Max Azria
Read more

BCBG Max Azria